At 200 million tons per year, demolition waste accounts for the majority of waste generated in Germany. This makes it all the more important to recycle this waste. High-quality mineral substitute building materials can be produced from construction and demolition waste!

 

 

Storage and pre-shredding on over 50,000 square meters

BBW Recycling Mittelelbe GmbH has over 50,000 square meters of floor space for the storage and pre-shredding of raw materials for recycling products such as

  • Brick rubble
  • concrete parts
  • road rubble and concrete as well as
  • natural stone materials,

efficient processing with a daily throughput of up to 1,500 tons, a washing plant for recycling products and loading quantities of up to 3,000 tons per day are the basis for the acceptance and recycling of demolition materials and the provision of high-quality recycling products.

Processing takes place with a two-stage crushing plant, 4 screening machines and material washing as well as mechanical and manual sorting of the demolition materials during processing. By using state-of-the-art plant technology, recycling products can be produced in line with requirements.

Have we aroused your interest?

Get in touch with us!

To the contact form

Translated with Deepl|2024-12-03 10:34:56